Posts Tagged ‘golden valley road bridge’

Traffic Alert: Santa Clarita and Caltrans Closures for Golden Valley Bridge Widening Project

August 14, 2015

Golden Valley Road Bridge Concrete Pour 3

From Monday, August 17 to Friday, August 28, State Route 14 and the Golden Valley Road Bridge at State Route 14 will be subject to nightly closures to accommodate the Golden Valley Road Bridge widening project. The City of Santa Clarita and Caltrans have separate closures during the construction.

city seal_3 in_rgb

Santa Clarita closures from Monday, August 17 to Friday, August 28:

  • Northbound SR-14
    Midnight – 6 a.m.
  • Southbound SR-14
    11 p.m. – 4 a.m.

State Route 14 traffic will be detoured utilizing State Route 14 off-ramps and on-ramps in each direction.

Caltrans closures from Monday, August 10, through Friday, August 14:

  • Northbound SR-14
    7 p.m. to 3 p.m. – Up to four lanes between I-5 and Sand Canyon Rd.
    6 p.m. to 3 p.m. – On- and off- ramps CLOSED between Sierra Highway and Sand Canyon Rd.
    7 p.m. to 2 p.m. – Connector from northbound I-5 CLOSED
  • Southbound SR-14
    6 p.m. to 5 a.m. – Up to four lanes between Sand Canyon Rd and I-5
    5 p.m. to 5 a.m. – On- and off- ramps CLOSED between Sand Canyon Rd. and Sierra Highway
    11 p.m. to 4 p.m. – Connector to Southbound I-5 CLOSED
    Friday, August 14, through Saturday, August 15

Caltrans closures from Friday, August 14, through Saturday, August 15:

  • Northbound SR-14
    7 p.m. to 7 p.m. – Up to four lanes between I-5 and Sand Canyon Rd.
    6 p.m. to 7 p.m. – On- and off- ramps CLOSED between Sierra Highway and Sand Canyon Rd.
    7 p.m. to 2 p.m. – Connector from northbound I-5 CLOSED
  • Southbound SR-14
    6 p.m. to 7 a.m. – Up to four lanes between Sand Canyon Rd and I-5
    5 p.m. to 7 a.m. – On- and off- ramps CLOSED between Sand Canyon Rd and Sierra Highway
    11 p.m. to 4 p.m. – Connector to Southbound I-5 CLOSED

This project may require FULL Freeway closures.

Golden Valley Road Bridge Concrete Pour 4

Click to view the Construction Cam.

To watch the expansion of the Golden Valley Road Bridge online, check out the live Construction Cam on the City’s website.

To receive email alerts on the Golden Valley Road Bridge widening project and other construction projects in the City, sign up at Santa-Clarita.com/eNotify.

Traffic Alert: Golden Valley Road and SR 14 Closures During Golden Valley Bridge Widening

July 31, 2015

Golden Valley Road Bridge Concrete Pour 7

From Monday, August 10, to Saturday, August 29, State Route 14 and the Golden Valley Road Bridge at State Route 14 will be subject to night closures to accommodate the Golden Valley Road Bridge widening project.

Golden Valley Road Bridge Concrete Pour 8

During the construction, the northbound State Route 14 will be closed from midnight to 6 a.m. and the southbound State Route 14 will be closed from 11 p.m. to 4 a.m. from August 10 to August 29. Both directions of the State Route 14 will never be closed at the same time. Golden Valley Road Bridge will also be subject to night closures from 9 p.m. to 5 a.m. from August 10 to August 29.

Golden Valley Road Bridge Concrete Pour 4

State Route 14 traffic will be detoured utilizing respective State Route 14 off-ramps and on-ramps in each direction. In addition, signs will be posted along Golden Valley Road Bridge advertising the closure.  Motorists who travel during the early hours through this area are advised to plan on slightly heavier traffic.

Golden Valley Road Bridge Concrete Pour 3

The Golden Valley Road Bridge widening project will add an additional two lanes of travel, one in each direction, for a total of four through lanes on the bridge, as well as a dedicated left turn lane to access the southbound State Route 14 and two left turn lanes to access the northbound State Route 14. This project will also add a pedestrian walkway on the north side of the bridge and a bike path on the south side of the bridge.

To watch the expansion of the Golden Valley Road Bridge online, check out the live Construction Cam on the City’s website.

To receive email alerts on the Golden Valley Road Bridge widening project and other construction projects in the City, sign up at Santa-Clarita.com/eNotify.

Traffic Alert: Golden Valley Road and SR 14 Closures during Golden Valley Road Bridge Widening

June 12, 2015
Golden Valley Road Bridge Concrete Pour 3

Construction crews have begun pouring the concrete for the new bridge.

From Monday, June 15 to Sunday, June 28, State Route 14 and Golden Valley Road Bridge will be subject to night closures to accommodate the Golden Valley Bridge Widening project.

Golden Valley Road Bridge Concrete Pour 4

During the bridge widening construction, the northbound State Route 14 will be closed from 12 a.m. to 6 a.m., and the southbound State Route 14 will be closed from 11 p.m. to 4 a.m. from June 15 to June 28. Golden Valley Road Bridge will also be closed from 9 p.m. to 5 a.m. from June 15 to June 28.

Golden Valley Road Bridge Concrete Pour 7

Detours of these closed areas will utilize the respective State Route 14 off-ramps and on-ramps in each direction. Motorists who travel during the early hours through this area are advised to plan on slightly heavier traffic.

Golden Valley Road Bridge Concrete Pour 8

The Golden Valley Bridge Widening project will add an additional two lanes of travel, one in each direction, for a total of four through lanes on the bridge as well as a dedicated left turn lane to access the southbound State Route 14 and two left turn lanes to access the northbound State Route 14. The project will also add a pedestrian walkway on the north side of the bridge and a bike path on the south side of the bridge.

To receive email alerts on the Golden Valley Bridge Widening Project and other construction projects in the City, sign up at Santa-Clarita.com/eNotify

VIP Hard Hat Tour Offers First-Hand Glimpse of Cross Valley Connector

March 19, 2010

Hard Hat Tour attendees head out on the Golden Valley Road bridge.

 The City of Santa Clarita hosted a VIP Hard Hat Tour yesterday for the nearly completed Cross Valley Connector. The brief event took guests on a walking tour of the 1,100 foot-long Golden Vally Road bridge to learn about the 8-mile  Cross Valley Connector road.

Mayor Laurene Weste and Mayor Pro Tem Marsha McLean welcome attendees.

The bridge is the final leg of the roadway linking Golden Valley Road and Bouquet Canyon Road/Newhall Ranch Road. The City will host a Grand Opening for the Cross Valley Connector on Saturday, March 27, 2010 to oficially open the long awaited road to the public.

Attendees look out over the bridge and across across the valley.

City Senior Engineer Hoon Hahn explains more about the Cross Valley Connector.

The hour-long tour took guests across the entire expanse of the Golden Valley Road Bridge over the Santa Clara River.

Councilmember Frank Ferry takes part in the tour.

City Engineer Hoon Hahn points out details relating to the Bridge's stormwater runoff.

Director of Public Works, Robert Newman, addresses Hard Hat Tour guests.


Follow

Get every new post delivered to your Inbox.

Join 374 other followers